Dawson, NE interconnection queue

3 active projects totaling 11.7 MW in the SPP queue, plus 4 with terminal status (shown grayed).

3active projects
11.7active MW
7total filed
Queue IDProjectkVMWResourceStatus
GEN-2001-040N Not reported n/r 400 Coal Withdrawn
GEN-2022-050 Not reported 230 272 Wind Withdrawn
GEN-2022-172 Not reported 230 140 Hybrid Withdrawn
GEN-2017-241 Not reported 115 10 Wind Withdrawn
GEN-2011-056B Not reported 115 4.5 Hydro Operational
GEN-2011-056 Not reported 115 3.6 Hydro Operational
GEN-2011-056A Not reported 115 3.6 Hydro Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.