Substation Scout

Dakota, NE interconnection queue

2 active projects totaling 360 MW in the SPP queue.

2active projects
360active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2023-199 Not reported 230 250 Hybrid Active
GEN-2024-162 Not reported 230 110 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first