Custer, OK interconnection queue
4 active projects totaling 276.8 MW in the SPP queue, plus 6 with terminal status (shown grayed).
4active projects
276.8active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2024-110 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2004-021 | Not reported | n/r | 150 | Wind | Withdrawn |
| GEN-2007-032 | Not reported | 138 | 150 | Wind | Withdrawn |
| GEN-2002-015 | Not reported | n/r | 130 | Wind | Withdrawn |
| GEN-2003-022 | Not reported | 138 | 120 | Wind | Operational |
| GEN-2023-SR20 | Not reported | 138 | 120 | Battery | Active |
| GEN-2009-030 | Not reported | 138 | 100.8 | Wind | Withdrawn |
| GEN-2004-022 | Not reported | n/r | 60 | Wind | Withdrawn |
| GEN-2004-020 | Not reported | 138 | 27 | Wind | Operational |
| GEN-2016-051 | Not reported | 138 | 9.8 | Wind | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.