Custer, OK interconnection queue

4 active projects totaling 276.8 MW in the SPP queue, plus 6 with terminal status (shown grayed).

4active projects
276.8active MW
10total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-110 Not reported 345 250 Wind Withdrawn
GEN-2004-021 Not reported n/r 150 Wind Withdrawn
GEN-2007-032 Not reported 138 150 Wind Withdrawn
GEN-2002-015 Not reported n/r 130 Wind Withdrawn
GEN-2003-022 Not reported 138 120 Wind Operational
GEN-2023-SR20 Not reported 138 120 Battery Active
GEN-2009-030 Not reported 138 100.8 Wind Withdrawn
GEN-2004-022 Not reported n/r 60 Wind Withdrawn
GEN-2004-020 Not reported 138 27 Wind Operational
GEN-2016-051 Not reported 138 9.8 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first