Curry, NM interconnection queue

3 active projects totaling 695 MW in the SPP queue, plus 17 with terminal status (shown grayed).

3active projects
695active MW
20total filed
Queue IDProjectkVMWResourceStatus
GEN-2001-005 Not reported n/r 640 Gas Withdrawn
GEN-2001-004 Not reported n/r 500 Gas Withdrawn
GEN-2017-007 Not reported 230 297.5 Wind Withdrawn
GEN-2020-062 Not reported 230 256 Solar Withdrawn
GEN-2024-079 Not reported 230 250 Solar Active
GEN-2024-080 Not reported 230 250 Solar Active
GEN-2001-020 Not reported n/r 200 Other Withdrawn
GEN-2022-171 Not reported 230 200 Wind Withdrawn
GEN-2022-232 Not reported 230 200 Solar Withdrawn
GEN-2022-233 Not reported 230 200 Battery Withdrawn
GEN-2024-353 Not reported 230 199 Battery Withdrawn
GEN-2024-089 Not reported 230 195 Wind Active
GEN-2017-116 Not reported 230 192.5 Solar Withdrawn
GEN-2017-087 Not reported 115 128 Solar Withdrawn
GEN-2018-020 Not reported 115 100 Solar Withdrawn
GEN-2024-001 Not reported 115 100 Solar Withdrawn
GEN-2022-170 Not reported 115 99 Hybrid Withdrawn
GEN-2015-018 Not reported 115 80 Wind Withdrawn
GEN-2007-027 Not reported n/r 60 Wind Withdrawn
GEN-2022-184 Not reported 69 59.4 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →