Cloud, KS interconnection queue
7 active projects totaling 1,430.1 MW in the SPP queue, plus 5 with terminal status (shown grayed).
7active projects
1,430.1active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2024-067 | Not reported | 345 | 380 | Solar | Active |
| GEN-2024-215 | Not reported | 345 | 300 | Hybrid | Active |
| GEN-2017-004 | Not reported | 345 | 201.6 | Wind | Active |
| GEN-2003-006A | Not reported | 230 | 201 | Wind | Operational |
| GEN-2005-009A | Not reported | n/r | 200 | Wind | Withdrawn |
| GEN-2007-028 | Not reported | n/r | 200 | Wind | Withdrawn |
| GEN-2008-049 | Not reported | n/r | 200 | Wind | Withdrawn |
| GEN-2017-119 | Not reported | 345 | 180 | Wind | Active |
| GEN-2017-118 | Not reported | 345 | 130 | Wind | Withdrawn |
| GEN-2024-288 | Not reported | 345 | 130 | Solar | Active |
| GEN-2021-011 | Not reported | 345 | 74.9 | Solar | Withdrawn |
| GEN-2021-017 | Not reported | 345 | 37.5 | Wind | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.