Substation Scout

Cloud, KS interconnection queue

7 active projects totaling 1,430.1 MW in the SPP queue, plus 5 with terminal status (shown grayed).

7active projects
1,430.1active MW
12total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-067 Not reported 345 380 Solar Active
GEN-2024-215 Not reported 345 300 Hybrid Active
GEN-2017-004 Not reported 345 201.6 Wind Active
GEN-2003-006A Not reported 230 201 Wind Operational
GEN-2005-009A Not reported n/r 200 Wind Withdrawn
GEN-2007-028 Not reported n/r 200 Wind Withdrawn
GEN-2008-049 Not reported n/r 200 Wind Withdrawn
GEN-2017-119 Not reported 345 180 Wind Active
GEN-2017-118 Not reported 345 130 Wind Withdrawn
GEN-2024-288 Not reported 345 130 Solar Active
GEN-2021-011 Not reported 345 74.9 Solar Withdrawn
GEN-2021-017 Not reported 345 37.5 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first