Substation Scout

Cheyenne, NE interconnection queue

1 active project totaling 40 MW in the SPP queue, plus 7 with terminal status (shown grayed).

1active projects
40active MW
8total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-151 Not reported 345 300 Wind Withdrawn
GEN-2024-150 Not reported 345 293.6 Wind Withdrawn
GEN-2024-152 Not reported 345 250.1 Wind Withdrawn
GEN-2020-001 Not reported 345 200 Solar Withdrawn
GEN-2016-079 Not reported 230 160 Solar Withdrawn
GEN-2022-028 Not reported 230 125 Hybrid Withdrawn
GEN-2019-042 Not reported 230 104 Solar Withdrawn
GEN-2016-147 Not reported 115 40 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.