Cheyenne, NE interconnection queue
1 active project totaling 40 MW in the SPP queue, plus 7 with terminal status (shown grayed).
1active projects
40active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2024-151 | Not reported | 345 | 300 | Wind | Withdrawn |
| GEN-2024-150 | Not reported | 345 | 293.6 | Wind | Withdrawn |
| GEN-2024-152 | Not reported | 345 | 250.1 | Wind | Withdrawn |
| GEN-2020-001 | Not reported | 345 | 200 | Solar | Withdrawn |
| GEN-2016-079 | Not reported | 230 | 160 | Solar | Withdrawn |
| GEN-2022-028 | Not reported | 230 | 125 | Hybrid | Withdrawn |
| GEN-2019-042 | Not reported | 230 | 104 | Solar | Withdrawn |
| GEN-2016-147 | Not reported | 115 | 40 | Solar | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.