Cass, MO interconnection queue
3 active projects totaling 381 MW in the SPP queue, plus 8 with terminal status (shown grayed).
3active projects
381active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2024-170 | Not reported | 345 | 280 | Battery | Active |
| GEN-2022-164 | Not reported | 345 | 200 | Battery | Withdrawn |
| GEN-2023-087 | Not reported | 161 | 200 | Solar | Withdrawn |
| GEN-2024-275 | Not reported | 161 | 150 | Solar | Withdrawn |
| GEN-2022-213 | Not reported | 161 | 120 | Solar | Withdrawn |
| GEN-2017-186 | Not reported | 161 | 100 | Solar | Withdrawn |
| GEN-2024-256 | Not reported | 161 | 100 | Battery | Withdrawn |
| GEN-2010-022 | Not reported | 161 | 75 | Wind | Withdrawn |
| GEN-2008-129 | Not reported | 161 | 72 | Gas | Operational |
| GEN-2018-121 | Not reported | 161 | 50 | Battery | Withdrawn |
| GEN-2020-061 | Not reported | 69 | 29 | Gas | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.
Site Scanner