Substation Scout

Cass, MO interconnection queue

3 active projects totaling 381 MW in the SPP queue, plus 8 with terminal status (shown grayed).

3active projects
381active MW
11total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-170 Not reported 345 280 Battery Active
GEN-2022-164 Not reported 345 200 Battery Withdrawn
GEN-2023-087 Not reported 161 200 Solar Withdrawn
GEN-2024-275 Not reported 161 150 Solar Withdrawn
GEN-2022-213 Not reported 161 120 Solar Withdrawn
GEN-2017-186 Not reported 161 100 Solar Withdrawn
GEN-2024-256 Not reported 161 100 Battery Withdrawn
GEN-2010-022 Not reported 161 75 Wind Withdrawn
GEN-2008-129 Not reported 161 72 Gas Operational
GEN-2018-121 Not reported 161 50 Battery Withdrawn
GEN-2020-061 Not reported 69 29 Gas Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.