Bourbon, KS interconnection queue

6 active projects totaling 1,224.3 MW in the SPP queue, plus 1 with terminal status (shown grayed).

6active projects
1,224.3active MW
7total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-013 Not reported 345 300 Solar Active
GEN-2020-090 Not reported 345 204.3 Battery Active
GEN-2022-024 Not reported 345 200 Battery Active
GEN-2022-054 Not reported 345 200 Solar Active
GEN-2022-062 Not reported 345 200 Solar Withdrawn
GEN-2017-005 Not reported 161 190 Wind Operational
GEN-2024-076 Not reported 345 130 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.