Antelope, NE interconnection queue
7 active projects totaling 1,123.7 MW in the SPP queue, plus 8 with terminal status (shown grayed).
7active projects
1,123.7active MW
15total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2018-044 | Not reported | 345 | 500 | Solar | Withdrawn |
| GEN-2015-023 | Not reported | 345 | 300.7 | Wind | Operational |
| GEN-2021-057 | Not reported | 345 | 300 | Wind | Active |
| GEN-2013-032 | Not reported | 115 | 202.5 | Wind | Operational |
| GEN-2008-086N02 | Not reported | 230 | 201 | Wind | Operational |
| GEN-2015-008 | Not reported | 115 | 150.4 | Wind | Withdrawn |
| GEN-2006-038N020 | Not reported | n/r | 100 | Wind | Withdrawn |
| GEN-2006-038N022 | Not reported | n/r | 100 | Wind | Withdrawn |
| GEN-2015-054 | Not reported | 115 | 74 | Wind | Withdrawn |
| GEN-2013-005 | Not reported | 230 | 73.5 | Wind | Withdrawn |
| GEN-2014-013 | Not reported | 230 | 73.5 | Wind | Operational |
| GEN-2015-053 | Not reported | 115 | 50 | Wind | Withdrawn |
| GEN-2014-031 | Not reported | 230 | 35.8 | Wind | Operational |
| GEN-2014-032 | Not reported | 230 | 10.2 | Wind | Operational |
| GEN-2013-004 | Not reported | 230 | 6 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.