Antelope, NE interconnection queue

7 active projects totaling 1,123.7 MW in the SPP queue, plus 8 with terminal status (shown grayed).

7active projects
1,123.7active MW
15total filed
Queue IDProjectkVMWResourceStatus
GEN-2018-044 Not reported 345 500 Solar Withdrawn
GEN-2015-023 Not reported 345 300.7 Wind Operational
GEN-2021-057 Not reported 345 300 Wind Active
GEN-2013-032 Not reported 115 202.5 Wind Operational
GEN-2008-086N02 Not reported 230 201 Wind Operational
GEN-2015-008 Not reported 115 150.4 Wind Withdrawn
GEN-2006-038N020 Not reported n/r 100 Wind Withdrawn
GEN-2006-038N022 Not reported n/r 100 Wind Withdrawn
GEN-2015-054 Not reported 115 74 Wind Withdrawn
GEN-2013-005 Not reported 230 73.5 Wind Withdrawn
GEN-2014-013 Not reported 230 73.5 Wind Operational
GEN-2015-053 Not reported 115 50 Wind Withdrawn
GEN-2014-031 Not reported 230 35.8 Wind Operational
GEN-2014-032 Not reported 230 10.2 Wind Operational
GEN-2013-004 Not reported 230 6 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first