Substation Scout

Greene County - North Selma Line substation interconnection queue

6 active projects totaling 885.8 MW in the Southern Company queue, plus 18 with terminal status (shown grayed).

24 Southern Company queue filings name Greene County - North Selma Line as the point of interconnection, all in AL.

6active projects
885.8active MW
24total filed
Queue IDProjectkVMWResourceStatus
IC-1071 Not reported 230 336 Solar Active
IC-863 Not reported 230 263.6 Hybrid Withdrawn
25-IC-AH Not reported 230 232 Hybrid Withdrawn
IC-795 Not reported 230 200 Solar Withdrawn
IC-895 Not reported 230 200 Hybrid Withdrawn
IC-1212 Not reported 230 199 Solar Withdrawn
25-IC-1370 Not reported 230 160 Hybrid Active
IC-1101 Not reported 230 150 Hybrid Suspended
IC-423 Not reported 230 117.6 Solar Withdrawn
IC-896 Not reported 230 100 Hybrid Withdrawn
IC-1077 Not reported 230 80 Hybrid Withdrawn
IC-1078 Not reported 230 80 Hybrid Withdrawn
IC-1086 Not reported 230 80 Hybrid Suspended
IC-443 Not reported 230 80 Solar Withdrawn
IC-501 Not reported 230 80 Solar Withdrawn
IC-650 Not reported 230 80 Solar Withdrawn
IC-750 Not reported 230 80 Solar Withdrawn
IC-927 Not reported 230 80 Hybrid Withdrawn
IC-1125 Not reported 230 79.9 Hybrid Withdrawn
IC-1126 Not reported 230 79.9 Hybrid Withdrawn
IC-1127 Not reported 230 79.9 Solar Active
IC-1128 Not reported 230 79.9 Solar Active
IC-474 Not reported 230 75 Solar Withdrawn
IC-412 Not reported 230 19.7 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first