Southern Company request 25-IC-1370
Southern Company queue ID 25-IC-1370
Queue request 25-IC-1370 was listed in the Southern Company interconnection queue at the end of 2025 as a 160 MW hybrid project in Perry County, AL, according to Berkeley Lab’s queue data file. The filing names Greene County - North Selma Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 15, 2028.
| Queue ID | 25-IC-1370 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Greene County - North Selma Line |
| Point of interconnection | Greene County - North Selma 230 kV Line |
| County | Perry |
| State | AL |
| Voltage | 230 kV |
| Capacity | 160 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2028-11-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Greene County - North Selma Line substation: 24 requests in the Southern Company queue, 6 active totaling 885.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| IC-1071 | Not reported | 336 | Solar | Active |
| IC-1101 | Not reported | 150 | Hybrid | Suspended |
| IC-1086 | Not reported | 80 | Hybrid | Suspended |
| IC-1127 | Not reported | 79.9 | Solar | Active |
| IC-1128 | Not reported | 79.9 | Solar | Active |
| IC-863 | Not reported | 263.6 | Hybrid | Withdrawn |
| 25-IC-AH | Not reported | 232 | Hybrid | Withdrawn |
| IC-795 | Not reported | 200 | Solar | Withdrawn |
| IC-895 | Not reported | 200 | Hybrid | Withdrawn |
| IC-1212 | Not reported | 199 | Solar | Withdrawn |
| IC-423 | Not reported | 117.6 | Solar | Withdrawn |
| IC-896 | Not reported | 100 | Hybrid | Withdrawn |
11 more on the substation page.
Perry, AL: 21 requests in the Southern Company queue, 6 active totaling 885.8 MW.
Tracked changes
Not tracked. Southern Company rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Southern Company |
|---|---|
| Interconnection service | ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Queue date | 2025-04-17 |
| Components (hybrid) | Solar 160 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.