Substation Scout

Bucks SS - North Brewton Line substation interconnection queue

3 active projects totaling 477.9 MW in the Southern Company queue, plus 6 with terminal status (shown grayed).

9 Southern Company queue filings name Bucks SS - North Brewton Line as the point of interconnection, all in AL.

3active projects
477.9active MW
9total filed
Queue IDProjectkVMWResourceStatus
IC-844 Not reported 230 300 Hybrid Withdrawn
25-IC-1376 Not reported 230 199 Solar Active
25-IC-1347 Not reported 230 198.9 Solar Active
IC-1065 Not reported 230 150 Solar Withdrawn
IC-1277 Not reported 230 150 Solar Withdrawn
IC-1278 Not reported 230 150 Solar Withdrawn
IC-487 Not reported 230 98 Solar Withdrawn
IC-1051 Not reported 230 80 Solar Suspended
IC-746 Not reported 230 80 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first