Queue request 25-IC-1387 was listed in the Southern Company interconnection queue at the end of 2025 as a 92 MW hybrid project in Sumter County, GA, according to Berkeley Lab’s queue data file. The filing names Flint Overlook Substaion Bus as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 15, 2028.
| Queue ID | 25-IC-1387 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Flint Overlook Substaion Bus |
| Point of interconnection | Flint Overlook Substaion 115 kV Bus |
| County | Sumter |
| State | GA |
| Voltage | 115 kV |
| Capacity | 92 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2028-06-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Sumter, GA: 13 requests in the Southern Company queue, 5 active totaling 1,407 MW.
Tracked changes
Not tracked. Southern Company rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Southern Company |
|---|---|
| Interconnection service | ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Facility Study |
| Queue date | 2025-04-17 |
| Components (hybrid) | Solar 92 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.