Southern Company request 25-IC-1320A
Southern Company queue ID 25-IC-1320A
Queue request 25-IC-1320A was listed in the Southern Company interconnection queue at the end of 2025 as a 240 MW gas project in Lee County, AL, according to Berkeley Lab’s queue data file. The filing names Goat Rock Substation Bus as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 1, 2029.
| Queue ID | 25-IC-1320A |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Goat Rock Substation Bus |
| Point of interconnection | Goat Rock Substation 230 kV Bus |
| County | Lee |
| State | AL |
| Voltage | 230 kV |
| Capacity | 240 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | 2029-10-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Goat Rock Substation Bus substation: 9 requests in the Southern Company queue, 3 active totaling 462 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 25-IC-1320B | Not reported | 111 | Gas | Active |
| 25-IC-1321 | Not reported | 111 | Gas | Active |
| IC-224 | Not reported | 666.7 | Gas | Withdrawn |
| IC-203 | Not reported | 655 | Gas | Withdrawn |
| IC-210 | Not reported | 630 | Gas | Withdrawn |
| IC-065 | Not reported | 610 | Gas | Withdrawn |
| IC-202 | Not reported | 595 | Gas | Withdrawn |
| IC-251 | Not reported | 520 | Gas | Withdrawn |
Lee, AL: 16 requests in the Southern Company queue, 5 active totaling 1,208 MW.
Tracked changes
Not tracked. Southern Company rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Southern Company |
|---|---|
| Interconnection service | ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Facility Study |
| Queue date | 2025-04-11 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.