Liberty, GA interconnection queue

3 active projects totaling 192.3 MW in the Southern Company queue, plus 2 with terminal status (shown grayed).

3active projects
192.3active MW
5total filed
Queue IDProjectkVMWResourceStatus
IC-1006 Not reported 115 150 Hybrid Suspended
IC-900 Not reported 115 90 Hybrid Withdrawn
IC-385 Fort Stewart Solar n/r 29.3 Solar Operational
IC-420 Not reported 115 16 Solar Withdrawn
IC-903 Not reported 115 13 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.