Substation Scout

Jackson, GA interconnection queue

1 active project totaling 325 MW in the Southern Company queue, plus 8 with terminal status (shown grayed).

1active projects
325active MW
9total filed
Queue IDProjectkVMWResourceStatus
IC-209 Not reported 230 890 Gas Withdrawn
IC-255 Not reported 230 782 Gas Withdrawn
IC-221 Not reported 230 761 Gas Withdrawn
IC-1217 Not reported 230 490 Gas Withdrawn
IC-254 Not reported 230 391 Gas Withdrawn
IC-225 Not reported 115 386 Gas Withdrawn
IC-226 Not reported 230 386 Gas Withdrawn
25-IC-1375 Not reported 230 325 Battery Active
25-IC-AC Not reported 230 287.5 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.