Substation Scout

Escambia, AL interconnection queue

5 active projects totaling 598.9 MW in the Southern Company queue, plus 10 with terminal status (shown grayed).

5active projects
598.9active MW
15total filed
Queue IDProjectkVMWResourceStatus
IC-085 Not reported 230 640 Gas Withdrawn
IC-074 Not reported 230 620 Gas Withdrawn
25-IC-1380 Not reported 230 200 Hybrid Active
25-IC-1347 Not reported 230 198.9 Solar Active
IC-1065 Not reported 230 150 Solar Withdrawn
IC-1277 Not reported 230 150 Solar Withdrawn
IC-1278 Not reported 230 150 Solar Withdrawn
APCQF-664 East Atmore n/r 80 Solar Operational
IC-1051 Not reported 230 80 Solar Suspended
IC-746 Not reported 230 80 Solar Withdrawn
IC-929 Not reported 115 79 Hybrid Withdrawn
IC-431 Not reported 115 78.6 Solar Withdrawn
IC-480 Not reported 115 75 Solar Withdrawn
IC-325 Georgai Pacific - Brewton Co-Gen n/r 40 Other Operational
IC-455 Not reported 46 39.3 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Southern Company before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first