Substation Scout

Hawks 12kV

PJM queue ID Z2-093 Terminal status

Queue IDZ2-093
Project nameHawks 12kV
Status (as published)Withdrawn
SubstationHawks
Point of interconnectionHawks 12kV
CountyHunterdon
StateNJ
Voltage12 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Storage
Resource categoryBattery (normalised for filtering)
Target commercial operation2014-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy3.5
Mw Capacity0
Mfo6.5
Withdrawn Date5/29/2014

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.