Substation Scout

Blackhawk 12.5kV

PJM queue ID Z2-090 Terminal status

Queue IDZ2-090
Project nameBlackhawk 12.5kV
Status (as published)Withdrawn
SubstationBlackhawk
Point of interconnectionBlackhawk 12.5kV
CountyWinnebago
StateIL
Voltage12.5 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Storage
Resource categoryBattery (normalised for filtering)
Target commercial operation2014-10-01
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy4
Mw Capacity0
Mfo4
Withdrawn Date6/13/2016

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.