Substation Scout

Smith-N. Fayette 138kV

PJM queue ID Z2-064 Terminal status

Queue IDZ2-064
Project nameSmith-N. Fayette 138kV
Status (as published)Withdrawn
SubstationSmith-N. Fayette
Point of interconnectionSmith-N. Fayette 138kV
CountyWashington
StatePA
Voltage138 kV
Capacity600 MW
Resource (as published)Natural Gas
Resource categoryGas (normalised for filtering)
Target commercial operation2018-06-01
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy651
Mw Capacity600
Mfo651
Withdrawn Date6/25/2015

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.