Clean River Power MR-7 (Philo)

PJM queue ID Z2-037 Terminal status

Queue IDZ2-037
Project nameClean River Power MR-7 (Philo)
Status (as published)Withdrawn
SubstationClean River Power MR-7 (Philo)
Point of interconnectionClean River Power MR-7 (Philo)
CountyMuskingum
StateOH
VoltageNot reported
Capacity4 MW
Resource (as published)Hydro
Resource categoryHydro (normalised for filtering)
Target commercial operation2016-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy3.95
Mw Capacity3.95
Mfo3.95
Withdrawn Date9/29/2014

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.