Substation Scout

Moundsville Power, LLC

PJM queue ID Y3-068 Terminal status

Queue IDY3-068
Project nameMoundsville Power, LLC
Status (as published)Withdrawn
SubstationGeorge Washington
Point of interconnectionGeorge Washington 138kV
CountyMarshall
StateWV
Voltage138 kV
Capacity525 MW
Resource (as published)Natural Gas
Resource categoryGas (normalised for filtering)
Target commercial operation2018-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy525
Mw Capacity525
Mfo525
Withdrawn Date4/27/2017

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.