Substation Scout

Toledo Solar

PJM queue ID Y2-091 Terminal status

Queue IDY2-091
Project nameToledo Solar
Status (as published)Withdrawn
SubstationToledo Solar
Point of interconnectionToledo Solar
CountyLucas
StateOH
VoltageNot reported
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operationNot reported
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy0.332
Mw Capacity0
Mfo0.332
Withdrawn Date1/13/2014

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.