Dequine 345kV

PJM queue ID Y2-084 Terminal status

Queue IDY2-084
Project nameDequine 345kV
Status (as published)Withdrawn
SubstationDequine
Point of interconnectionDequine 345kV
CountyTippecance
StateIN
Voltage345 kV
Capacity3.3 MW
Resource (as published)Storage
Resource categoryBattery (normalised for filtering)
Target commercial operation2014-02-28
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy64
Mw Capacity3.33
Mfo64
Withdrawn Date3/14/2014

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.