Substation Scout

Fredon Solar Farm

PJM queue ID Y1-084 Terminal status

Queue IDY1-084
Project nameFredon Solar Farm
Status (as published)Withdrawn
SubstationEast Newton–Blairstown
Point of interconnectionEast Newton–Blairstown 34.5kV
CountySussex
StateNJ
Voltage34.5 kV
Capacity0.8 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2015-05-30
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy1.99
Mw Capacity0.76
Mfo1.99
Withdrawn Date5/16/2017

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.