Linkwood Solar

PJM queue ID X3-015 Terminal status

Queue IDX3-015
Project nameLinkwood Solar
Status (as published)Withdrawn
SubstationWest Cambridge-Vienna
Point of interconnectionWest Cambridge-Vienna 69kV
CountyDorchester
StateMD
Voltage69 kV
Capacity7.4 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2017-09-01
Source datasetserial

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy19.5
Mw Capacity7.41
Mfo19.5
Withdrawn Date10/10/2017