Substation Scout

Barberton Solar

PJM queue ID X2-085 Terminal status

Queue IDX2-085
Project nameBarberton Solar
Status (as published)Withdrawn
SubstationBarberton–Seiberling
Point of interconnectionBarberton–Seiberling 23kV
CountySummit
StateOH
Voltage23 kV
Capacity5.3 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2014-06-30
Source datasetserial

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy14
Mw Capacity5.32
Mfo14
Withdrawn Date6/12/2014

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.