Substation Scout

White Township Solar Farm

PJM queue ID W4-068 Terminal status

Queue IDW4-068
Project nameWhite Township Solar Farm
Status (as published)Withdrawn
SubstationHazen-Pequest River
Point of interconnectionHazen-Pequest River 34.5kV
CountyWarren
StateNJ
Voltage34.5 kV
Capacity3 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2014-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy8
Mw Capacity3
Mfo8
Withdrawn Date3/17/2015

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.