Substation Scout

Frack-Orwigsburg 69kV

PJM queue ID W4-013 Terminal status

Queue IDW4-013
Project nameFrack-Orwigsburg 69kV
Status (as published)Withdrawn
SubstationFrack-Orwigsburg
Point of interconnectionFrack-Orwigsburg 69kV
CountySchuylkill
StatePA
Voltage69 kV
Capacity6.5 MW
Resource (as published)Wind
Resource categoryWind (normalised for filtering)
Target commercial operation2014-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy50
Mw Capacity6.5
Mfo50
Withdrawn Date11/13/2011

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.