Substation Scout

Turning Point Solar

PJM queue ID W3-113 Terminal status

Queue IDW3-113
Project nameTurning Point Solar
Status (as published)Withdrawn
SubstationS. Cumberland
Point of interconnectionS. Cumberland 69kV
CountyNoble
StateOH
Voltage69 kV
Capacity5.7 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2019-04-16
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy14.9
Mw Capacity5.7
Mfo49.9
Withdrawn Date7/25/2018

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.