Substation Scout

Greenfield Wind Farm

PJM queue ID W3-099 Terminal status

Queue IDW3-099
Project nameGreenfield Wind Farm
Status (as published)Withdrawn
SubstationErie East-Erie South
Point of interconnectionErie East-Erie South 230 kV
CountyErie
StatePA
Voltage230 kV
Capacity13 MW
Resource (as published)Wind
Resource categoryWind (normalised for filtering)
Target commercial operation2019-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy100
Mw Capacity13
Mfo100
Withdrawn Date9/10/2018

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.