Powerton 345kV

PJM queue ID W3-046 Terminal status

Queue IDW3-046
Project namePowerton 345kV
Status (as published)Withdrawn
SubstationPowerton
Point of interconnectionPowerton 345kV
CountyMason
StateIL
Voltage345 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Wind
Resource categoryWind (normalised for filtering)
Target commercial operation2015-12-31
Source datasetserial

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy207.5
Mw Capacity0
Mfo207.5
Withdrawn Date5/17/2018

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.