Saylors Pond Solar Farm

PJM queue ID W3-025 Terminal status

Queue IDW3-025
Project nameSaylors Pond Solar Farm
Status (as published)Withdrawn
SubstationWrightstown
Point of interconnectionWrightstown 34.5kV
CountyBurlington
StateNJ
Voltage34.5 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2014-09-01
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy2.06
Mw Capacity0
Mfo2.06
Withdrawn Date6/22/2016

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.