Substation Scout

Frackville-Eldred #2 230kV

PJM queue ID W3-023 Terminal status

Queue IDW3-023
Project nameFrackville-Eldred #2 230kV
Status (as published)Withdrawn
SubstationFrackville-Eldred #2
Point of interconnectionFrackville-Eldred #2 230kV
CountySchuylkill
StatePA
Voltage230 kV
Capacity15.6 MW
Resource (as published)Wind
Resource categoryWind (normalised for filtering)
Target commercial operation2014-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy120
Mw Capacity15.6
Mfo120
Withdrawn Date10/3/2011

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.