Hans Meadow 12.47KV

PJM queue ID W3-010 Terminal status

Queue IDW3-010
Project nameHans Meadow 12.47KV
Status (as published)Withdrawn
SubstationHans Meadow
Point of interconnectionHans Meadow 12.47KV
CountyMontgomery
StateVA
Voltage12.5 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Methane
Resource categoryGas (normalised for filtering)
Target commercial operation2010-08-01
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy0.34
Mw Capacity0
Mfo0.34
Withdrawn Date6/16/2011

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.