Substation Scout

Heatherwoods Solar Farm

PJM queue ID W1-105 Terminal status

Queue IDW1-105
Project nameHeatherwoods Solar Farm
Status (as published)Withdrawn
SubstationReamstown
Point of interconnectionReamstown
CountyLancaster
StatePA
VoltageNot reported
Capacity1.1 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2017-06-30
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy3
Mw Capacity1.14
Mfo3
Withdrawn Date8/11/2014

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.