Keller Solar Farm

PJM queue ID W1-076 Terminal status

Queue IDW1-076
Project nameKeller Solar Farm
Status (as published)Withdrawn
SubstationKingwood
Point of interconnectionKingwood
CountyHunterdon
StateNJ
VoltageNot reported
Capacity3.8 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2012-06-30
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy10
Mw Capacity3.8
Mfo10
Withdrawn Date5/16/2014

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.