Substation Scout

Ashtabula 138kV

PJM queue ID W1-070A_AT4 Terminal status

Queue IDW1-070A_AT4
Project nameAshtabula 138kV
Status (as published)Withdrawn
SubstationAshtabula
Point of interconnectionAshtabula 138kV
CountyAshtabula
StateOH
Voltage138 kV
Capacity6.5 MW
Resource (as published)Wind
Resource categoryWind (normalised for filtering)
Target commercial operation2016-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy50
Mw Capacity6.5
Mfo50
Withdrawn Date4/16/2014

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.