Substation Scout

Double Toll Gate 138kV

PJM queue ID V4-053 Terminal status

Queue IDV4-053
Project nameDouble Toll Gate 138kV
Status (as published)Withdrawn
SubstationDouble Toll Gate
Point of interconnectionDouble Toll Gate 138kV
CountyClarke
StateVA
Voltage138 kV
Capacity7.6 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2011-11-01
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy20
Mw Capacity7.6
Mfo20
Withdrawn Date11/28/2012

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.