Fostoria Central 138kV

PJM queue ID V4-015 Terminal status

Queue IDV4-015
Project nameFostoria Central 138kV
Status (as published)Withdrawn
SubstationFostoria Central
Point of interconnectionFostoria Central 138kV
CountyHancock
StateOH
Voltage138 kV
Capacity8.6 MW
Resource (as published)Wind
Resource categoryWind (normalised for filtering)
Target commercial operation2015-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy66.6
Mw Capacity8.6
Mfo66.6
Withdrawn Date9/15/2014

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.