Deerfield Project

PJM queue ID V4-009 Terminal status

Queue IDV4-009
Project nameDeerfield Project
Status (as published)Withdrawn
SubstationUpper Deerfield
Point of interconnectionUpper Deerfield
CountyCumberland
StateNJ
VoltageNot reported
Capacity3.8 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2014-06-01
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy10
Mw Capacity3.8
Mfo10
Withdrawn Date11/25/2013

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.