Substation Scout

Leipsic Wind Project

PJM queue ID V2-006 Terminal status

Queue IDV2-006
Project nameLeipsic Wind Project
Status (as published)Withdrawn
SubstationEast Leipsic
Point of interconnectionEast Leipsic 138kV
CountyPutnam
StateOH
Voltage138 kV
Capacity19.5 MW
Resource (as published)Wind
Resource categoryWind (normalised for filtering)
Target commercial operation2021-12-31
Source datasetserial

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy150
Mw Capacity19.5
Mfo150
Withdrawn Date2/21/2020

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.