Foul Rift 34.5kV

PJM queue ID U2-094 Terminal status

Queue IDU2-094
Project nameFoul Rift 34.5kV
Status (as published)Withdrawn
SubstationFoul Rift
Point of interconnectionFoul Rift 34.5kV
CountyWarren
StateNJ
Voltage34.5 kV
Capacity7.2 MW
Resource (as published)Solar
Resource categorySolar (normalised for filtering)
Target commercial operation2010-12-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy19
Mw Capacity7.2
Mfo19
Withdrawn Date9/2/2009

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.