Possum Point 230kV
PJM queue ID S99 Terminal status
| Queue ID | S99 |
|---|---|
| Project name | Possum Point 230kV |
| Status (as published) | Withdrawn |
| Substation | Possum Point |
| Point of interconnection | Possum Point 230kV |
| County | Prince William |
| State | VA |
| Voltage | 230 kV |
| Capacity | 20 MW |
| Resource (as published) | Oil |
| Resource category | Other (normalised for filtering) |
| Target commercial operation | 2013-05-01 |
| Source dataset | serial |
Additional filed fields
| Project Type | Generation Interconnection |
|---|---|
| Mw Energy | 20 |
| Mw Capacity | 20 |
| Mfo | 806 |
| Withdrawn Date | 4/3/2009 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.