Substation Scout

Graceton 230kV

PJM queue ID S23 Terminal status

Queue IDS23
Project nameGraceton 230kV
Status (as published)Withdrawn
SubstationGraceton
Point of interconnectionGraceton 230kV
CountyYork
StatePA
Voltage230 kV
Capacity550 MW
Resource (as published)Natural Gas
Resource categoryGas (normalised for filtering)
Target commercial operation2011-06-01
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy550
Mw Capacity550
Mfo550
Withdrawn Date9/9/2009

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.