Woodridge 12kV
PJM queue ID Q15 Terminal status
| Queue ID | Q15 |
|---|---|
| Project name | Woodridge 12kV |
| Status (as published) | Withdrawn |
| Substation | Woodridge |
| Point of interconnection | Woodridge 12kV |
| County | Du Page |
| State | IL |
| Voltage | 12 kV |
| Capacity | 6.6 MW |
| Resource (as published) | Methane |
| Resource category | Gas (normalised for filtering) |
| Target commercial operation | 2007-06-01 |
| Source dataset | serial |
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project Type | Generation Interconnection |
|---|---|
| Mw Energy | 6.6 |
| Mw Capacity | 6.6 |
| Mfo | 6.6 |
| Withdrawn Date | 8/10/2010 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.