Substation Scout

Cambria Slope 115kV

PJM queue ID M22 Terminal status

Queue IDM22
Project nameCambria Slope 115kV
Status (as published)Withdrawn
SubstationCambria Slope
Point of interconnectionCambria Slope 115kV
CountyCambria
StatePA
Voltage115 kV
Capacity125 MW
Resource (as published)Coal
Resource categoryCoal (normalised for filtering)
Target commercial operation2008-02-01
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy125
Mw Capacity125
Mfo125
Withdrawn Date10/23/2006

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.