Substation Scout

Birdsboro 13.2kV

PJM queue ID L20 Terminal status

Queue IDL20
Project nameBirdsboro 13.2kV
Status (as published)Withdrawn
SubstationBirdsboro
Point of interconnectionBirdsboro 13.2kV
CountyBerks
StatePA
Voltage13.2 kV
Capacity9.9 MW
Resource (as published)Methane
Resource categoryGas (normalised for filtering)
Target commercial operation2005-03-31
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy9.9
Mw Capacity9.9
Mfo10
Withdrawn Date8/4/2004

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.