Strasburg 138 kV

PJM queue ID C01-2049 Terminal status

Queue IDC01-2049
Project nameStrasburg 138 kV
Status (as published)Withdrawn
SubstationStrasburg
Point of interconnectionStrasburg 138 kV
CountyShenandoah
StateVA
Voltage138 kV
Capacity140 MW
Resource (as published)Storage
Resource categoryBattery (normalised for filtering)
Target commercial operation2031-04-01
Source datasetcycle

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-28 Terminal status 140 Active → Withdrawn

Full change log →

Additional filed fields

DeveloperHanwha Energy USA Holdings Corp
Transmission OwnerAPS
Project TypeGeneration Interconnection
CycleC01
StagePhase 1
Mw Energy140.0
Mw Capacity140.0
Mfo140.0
Submitted Date4/27/2026
Withdrawn Date9/24/2026
Withdrawn RemarksCIW
Last Updated6/8/2026