Substation Scout

Red Oak 230 kV

PJM queue ID C01-2018 Terminal status

Queue IDC01-2018
Project nameRed Oak 230 kV
Status (as published)Withdrawn
SubstationRed Oak
Point of interconnectionRed Oak 230 kV
CountyMiddlesex
StateNJ
Voltage230 kV
Capacity35 MW
Resource (as published)Natural Gas
Resource categoryGas (normalised for filtering)
Target commercial operation2030-04-30
Source datasetcycle

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Terminal status 35 Active → Withdrawn

Full change log →

Additional filed fields

DeveloperRed Oak Power, LLC
Transmission OwnerJCPL
Project TypeGeneration Interconnection
CycleC01
StagePhase 1
Mw Energy35.0
Mw Capacity35.0
Mfo882.5
Submitted Date4/24/2026
Withdrawn Date9/28/2026
Withdrawn RemarksCIW
Last Updated7/15/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.